NEW 330KV BAY AT MUZUMA SUBSTATION & 330kV MUZUMA-SINAZEZE OHTL

NAME  :  New 330kV Bay at Muzuma Substation & 330kV Muzuma-Sinazeze OHTL

TYPE  :  High-Voltage Transmission Infrastructure

LOCATION  :  Southern Province, Zambia

EST. PRJ COST :  $20m

CLIENT  :  EZRA Energy Limited

CONTRACTORS: Gilton Trading & General Construction

ROLE: High-Voltage Transmission Engineers

SCOPE:

▸  High-voltage electrical systems design (330kV)

▸  Protection & control systems engineering

▸  Substation bay extension design

▸  Single line diagrams & protection coordination studies